ULTRAJET UJ40-800
ULTRAJET UJ40-800 is a professional heavy-duty High Pressure Water Blaster with a high performance crank shaft, ceramic pistons and the simplest design – aimed to reduce the Total Cost of Ownership (TCOO). It is suitable for a wide range of applications, and it is designed to reduce the complexity of maintenance without compromising the quality and durability for heavy duty usage under the toughest conditions.
Standard Equipment
- 15m 4-core oil resistance electric cable with 4-pin plug
- 20m wear resistance high pressure hose with steel fittings
- High pressure 15Kpsi dump gun with 1200mm stainless-steel lance and nozzle
- User manual book with part list
Highlights
- Made in Singapore with EU pump
- Heavy duty structural frame
- Triplex tungsten carbide plunger pump
- Asynchronous three-phase 30 KW high-efficiency IP55 motor
- Low water inlet pressure protection switch
- Rupture disc system
- Booster pump with pressure gauge
- Stainless steel pressure gauge with glycerin
- 50 microns water filter with replaceable cartridge
- Weatherproof star-delta control panel with E stop and trip warning light
Optional Accessories
- Extension hoses with connectors
- Extension electric cable
- Rotating nozzle
- Drain and pipe cleaning nozzles
- Spare part kits
- High pressure protection clothing, helmet with face shield and earmuff
- Hose protection
Read and comply with these original instructions prior to the initial operation of the machine. Before first start-up it is necessary to read the operating instructions and safety indications.
Machine Start Up
➔ Connect water supply hose to the water inlet of machine
➔ Connect the high-pressure hose with the trigger gun to the outlet fitting of the machine. (use only original hose supplied by ASEA Marine)
➔ Turn on the water supply (Ensure sufficient water supply with a minimum inlet pressure of 2bar and 20 l/min)
➔ Plug in main power supply and switched it on**
➔ Pressed the start button on the electrical panel box
➔ Pressed lever on the trigger handle, and you can begin operating with your machine.
**Note: When you switched on the mains and the red Led light on the starter panel box is on, it means the water supply pressure (min 1 bar and above) is weak, and you will not be able to turn on the machine for safety reason. Please try other water supply source with higher pressure.
**First oil change after 50 operating hours, further oil changes after every 500 operating hours. (recommended oil SAE 10/40W).